CONSTRUCTION OF TURNKEY FOUNDATIONS: STRIP, PILE, USP, MONOLITHIC PLATE

We carry out the construction of turnkey foundations at a price of 6,000 rubles per m/p. The minimum period is 7 days. We will purchase the materials and deliver them ourselves. We use professional formwork, tools and equipment. We carry out the installation of foundations in strict accordance with the structural calculations. We use reinforcement with a diameter of 14 and 16 mm, concrete not lower than grade M350.

We guarantee:

  • strict adherence to deadlines;
  • an officially concluded agreement;
  • online observation or photo and video reports every week;
  • benefit up to 20% on materials through purchasing at the wholesale price list.

We carry out a range of works on site marking, pit digging, and relief planning. We do not engage in subcontracting - SBC employs only full-time specialists. During the pouring process we use up to 4 deep vibrators simultaneously. We moisten the concrete daily during the period of strength gain. We remove the formwork carefully, without knocking off the corners.

TYPES AND COSTS OF FOUNDATIONS FOR A PRIVATE HOUSE

The price depends on the type of base, the amount of concrete and reinforcement required. Approximate calculations can be found in the table below on the page. We carry out the construction of foundations for private houses of all types:

  • monolithic-tape
    – universal type of base, suitable for clay, sandy, heaving soils;
  • pile-grillage
    - used in areas with deep levels of freezing, complex terrain and weak-bearing soil;
  • monolithic slab
    - has a high load-bearing capacity, suitable for the construction of houses of any type;
  • insulated Swedish plate (USP)
    – due to insulation, the foundation reduces heat loss by 30-60%;
  • prefabricated foundation made from FBS blocks
    - easy to install, characterized by high construction speed and relatively low price.

In the Moscow region, soils mainly fall into the “loam” category. Groundwater can be at a depth of 1 meter, so SBC specialists must conduct a geostudy before starting work.

Types of services

Depending on the material used, it is possible to knit the reinforcement:

  • Knitting wire.
  • Metal clips.
  • Plastic fasteners.
  • Crimp and threaded couplings.

Also, the knitting of the rods of the structure is carried out using welding machines. This method allows you to create a very strong connection.

Knitting of reinforcing elements according to the tool used can be performed:

  • A screwdriver.
  • Hand crochet.
  • Knitting gun.
  • With pliers.
  • With pincers.


Knitting reinforcement for a screwdriver
It is possible to knit the following reinforcement:

  1. Steel . Classic option. Divided into six types according to strength.
  2. Composite . Consists of carbon, aramid, basalt and glass fibers. It is characterized by lower cost and ease of installation.

It is possible to connect reinforcement elements with smooth and corrugated surfaces.

Knitting of reinforcement according to the type of performer is as follows:

  • Professional.
  • Independent.

Professional service can be performed:

  • Private master.
  • Full-time fitter, builder.

According to the execution time, the order can be:

  • Urgent.
  • Ordinary.

MONOLITHIC-BELT FOUNDATION

Used in heaving soils.
This type of foundation can withstand heavy loads; there is the possibility of arranging a basement floor. Turnkey price - from 8,000 rubles per m.p. Load bearing capacity:

  • Device cost:
  • Manufacturability:
  • from 8.500 ₽/m.p.
    work+materials

    • Order
    • More details
  • Approximate price level

    In Russia, you can order the binding of a reinforcement cage for arranging the foundation of a structure from a specialized company for 1500-4600 rubles/cub.m . Approximate prices for the service in popular construction organizations in the country are shown in the table below.

    Company nameCompany location cityCost of service in rubles per cubic meter
    Real EstateSaint Petersburg4600
    Optimal ConstructionMoscow2100
    Brother KoVolgograd1800-2300
    Brigade58Penza1500-2500
    IMF-StroyOmsk2950
    Opora Stroy EngineeringKrasnodar2600
    ProfStroySaint Petersburg2000

    Private craftsmen provide the service of tying the reinforcement frame at a more attractive price: 900-1800 rubles per cubic meter.

    PILE-GRILLF FOUNDATION

    Suitable for houses up to two floors - it is designed for relatively light loads. Cannot be used in moving soils. It will not be possible to arrange the ground floor. The main advantage is the relatively low price - from 6,000 rubles. per m.p.

      Load bearing capacity:
    • Device cost:
    • Manufacturability:

    from 6.000 ₽/m.p.
    work+materials

    • Order
    • More details
  • Rules for choosing concrete for pouring a foundation

    According to existing standards, the class of concrete used for foundations cannot be lower than B20 (m²50); for piles and grillages, B15 (m²00) is acceptable. Not only the compressive strength is important, but also the water permeability of concrete - for foundations a grade of at least W6 is used. Usually it is combined with strength class B22.5 (m³00) - this is the main one in low-rise construction.

    Calculation of the cost of concrete for the foundation

    Ready-made concrete of class B22.5 in different regions costs between 3750-4150 rubles. Based on the recipe of this brand, let's try to calculate its cost if you prepare the mixture by hand.

    • When using cement grade M500, the proportions of sand and crushed stone in relation to the binder will be as follows: 1: 2.4: 4.3.
    • Let's substitute the weight of the bag as 50 kg instead of unity, in which case 120 kg of sand will be needed, and 215 kg of crushed stone.
    • The average cost of a bag of cement is 295 rubles, sand - 0.25 rubles. per kg, granite crushed stone fraction 10-20 - 1.35 rubles. per kg.
    • We substitute prices and calculate: 295+120x0.65 +215x1.35 = 663.25 rubles.
    • For a cubic meter of concrete m³00 it takes 6 bags of M500 cement, so we multiply 663.25 by 6 and get 3980 rubles.

    We took average prices, in fact it turns out the same as taking a ready-made mixture. But if you make concrete yourself, you won’t have to pay for delivery, and this, depending on the range of the RBU and the amount of mixture, can amount to more than 10,000 rubles.

    FOUNDATION - MONOLITHIC PLATE

    Suitable for weak and moving soil. Withstands colossal loads. The main disadvantage of this is the high cost - from 6,000 per m2, because... Significantly more reinforcement and concrete are required.

      Load bearing capacity:
    • Device cost:
    • Manufacturability:

    from 6.000 ₽/sq.m.
    work+materials

    • Order
    • More details
  • INSULATED SWEDISH PLATE

    USHP is suitable for any type of soil, can withstand enormous loads, there are no “cold bridges” - you immediately get a warm floor for your home. During its construction, energy-saving technologies are used, which allow you to save on heating in the future. The cost of USP is from 6,500 rubles. per m2.

      Load bearing capacity:
    • Device cost:
    • Manufacturability:

    from 6.500 ₽/sq.m.
    work+materials

    • Order
    • More details
  • PREFABRICATED MONOLITHIC FOUNDATION FROM FBS BLOCKS

    An ideal solution if you need to build a basement quickly. It has high compressive strength and withstands frost. Suitable for clayey, sandy, low-heaving soils, and for soils with high acidity. Popular due to its simple installation, speed of construction, and relatively low cost - from 8,000 rubles. per m.p.

      Load bearing capacity:
    • Device cost:
    • Manufacturability:

    from 8.000 ₽/m.p.
    work+materials

    • Order
    • More details

    Service characteristics

    Tying reinforcement is work that involves connecting parts of reinforcement . The result is a reliable structure , ensuring the creation of a stronger and more durable foundation for the structure. The foundation is usually made of concrete. Proper connection of the rods ensures high compressive and tensile strength of the concrete layer.

    A special tool is used to tie the reinforcement. It is important to comply with all established rules and regulations. Therefore, many resort to the help of professionals (fitters, builders).

    SIZES, PRICES AND VOLUME OF CONCRETE

    The cost of building a foundation is calculated on the basis of design solutions, where the depth, height, width, volume of materials and work are determined. The most popular foundations are 6x8, 8x8, 10x10, 10x12 meters. The volume of concrete depends on the amount of reinforcement (linking pattern) and the size of the future house. Experts analyzed actual estimates for 2021-2022 and compiled a table where you can see how much a foundation of popular sizes costs depending on the type of foundation. The price includes planning, site marking, and a complex of earthworks. To get an accurate estimate, contact the manager.

    • 6 by 6
    • 6 by 8
    • 6 by 9
    • 8 by 8
    • 8 by 9
    • 8 by 10
    • 10 by 10
    • 10 by 11
    • 10 by 12

    Concrete works

    Prices are for reference only and are valid only when ordering a turnkey project. Our company does not provide separate services.

    NameUnitPrice, rub)
    1Pouring and laying concrete - delivery with a mixer (formwork, reinforcement, concreting)m?640-720
    2Pouring and laying concrete - manual mixing (formwork, reinforcement, concreting)m?800-900
    3Treatment of concrete surfacesm?200-400
    4Installation of a monolithic ceiling for a cottage and other buildings (overlap height - up to 3.0 m)m?2600-3200
    5Construction of a monolithic foundation for a cottage, fence, etc. (double formwork, concrete up to 0.4 m thick) m?3200-3400
    6Construction of a monolithic foundation for a cottage, fence, etc. (double formwork, concrete thickness from 0.4 to 0.7 m) m?3400-3600
    7Installation of a monolithic concrete foundation for columns, with installation of formwork up to 3 mm?3400-3600
    8Construction of monolithic foundation flat slabs with the manufacture of reinforcement frames and installation of formworkm?3300-3500
    9Construction of small monolithic reinforced concrete grillages and foundation pads with laying and viscous reinforcement, assembly and disassembly of formwork and manual preparation of concretem?3800-4500
    10Construction of strip foundations and basement walls made of concrete blocks with the preparation of mortar and assembly and disassembly of formworkm?3800-4200
    11Construction of a strip foundation: laying depth of 0.5 m under a sand cushion (backfill)m?3900-4400
    12Knitting reinforcement cagesm?2000-2400
    13Construction of monolithic platforms for various purposes (entrance platforms, blind areas, paths) concrete thickness up to 0.2 mm?2500-3000
    14Construction of staircases and landingsm?2500-2700
    15Construction of a monolithic staircase “in concrete” (without finishing)m?2800-2900
    16Construction of monolithic retaining wallsm?1700-2300
    17Construction of terracesm?1000-1400
    18Concreting paths and platformsm?100-140
    19Blind area devicem?130-180
    20Porch arrangementm?1300-1800
    21Construction of a concrete balconym?2100-2800
    22Construction of monolithic bowls for swimming pools and small plunge pools (wall thickness up to 0.2 m)m?2800-3400
    23Construction of monolithic bowls for swimming pools and small plunge pools (wall thickness from 0.2 to 0.4 m)m?2400-2800
    24Strengthening foundations and other building structures using concrete pouring methodm?3000-3600
    25Deepening of foundations and other building structures using concrete pouring methodm?3200-3800
    26Concrete floors 200 mm sanded with trowels and sandersm?1200-1250
    27Concrete floors 200 mm with topping (with a reinforced top layer)m?1500-1600
    28Epoxy floors (including 200 mm concrete preparation)m?1800-1900
    29Polyurethane floors (including concrete preparation 200 mm)m?2000-22000
    Installation of fences on a concrete base
    30Installation of fences (concreting columns, plinths)p.m.300-350
    31Installation of a European fence (pits for posts, concreting posts, assembling sections)1 span500-600
    32Filling cracks between sections with mortar1 span150-200
    33Loading/unloading sections and columns1 span50-80
    34Crushed stone and sand preparationm?80-100
    35Excavation work, soil developmentm?600-1000

    Crocop-Stroy

    Rating
    ( 2 ratings, average 4 out of 5 )
    Did you like the article? Share with friends:
    For any suggestions regarding the site: [email protected]
    Для любых предложений по сайту: [email protected]